What does post construction cleaning in Karachi include?
In accessible areas SafaiKaro dusts ceiling edges, walls, ledges, door tops, frames, window tracks, fittings and the inside of fitted cupboards. We clean internal glass, wash the floors more than once, wipe sanitary ware and kitchen units, and bag loose debris to one agreed point on site. Every area goes on a handover checklist at the end.
What is the difference between construction dust, residue and debris?
Dust is the fine cement, plaster and wood powder that keeps falling out of the structure for days, so it needs repeated passes. Residue is bonded to the surface: paint specks, grout haze, cement splash, silicone and adhesive. Debris is loose leftover material. We price them as different work because they take different time and different methods.
Do you remove construction debris from the site?
We collect loose debris, bag it and stack it at the point the building management or your contractor names. Taking construction waste away from the site is not something SafaiKaro arranges: rubble, broken tiles, timber and any load needing a truck or skip stay with your contractor, along with the disposal.
Which areas are not covered by post construction cleaning?
We work only where the team can reach safely from the floor with standard ladders and poles. Outside faces of upper floor windows, facades, rope access, scaffolding, roofs, shafts, lift pits, ceiling voids and duct interiors are excluded. So are repairs, snagging, paint touch ups, floor grinding, marble polishing and crystallisation.
Will one clean be enough before handover?
Usually not, if other trades are still working. Dust keeps dropping from the structure and from live work next door, so a rough clean during the tail of the works and a final clean close to handover is the normal pattern. If the site is finished and closed, one thorough clean can be enough.
Can every construction mark be removed?
No, and a quotation that says otherwise has not seen the surface. Cement splash, grout haze and adhesive usually come off glass and tile. On painted walls, powder coated frames, polished stone, laminate and anodised surfaces the force needed to shift a bonded mark can damage the finish, so we leave it and record it.
What is on the handover checklist?
A written area by area list: what we cleaned, what we deliberately left out and why, and any damage or missing fitting we noticed, recorded as an observation. We walk it through and agree it with your site contact before we leave. It is a work record between SafaiKaro and you, not a certificate, an inspection result or an approval of the building.
Which areas of Karachi do you cover for post construction cleaning?
SafaiKaro takes handover and post renovation work across Karachi, subject to the site's location, size and handover date. Send the broad area on WhatsApp with the covered area and the handover date, and we confirm whether we can take the job before arranging a survey. We quote from photos or a walk through, so this is never a same day visit.