New-Construction Termite Treatment

Pre-Construction Termite Treatment in Karachi — Protect Your Home Before It's Built

Ghar banane se pehle termite treatment ko construction schedule mein plan karein.

✓ 90-day guarantee ✓ Treatment details confirmed ✓ Project quote after inspection
Termite soil treatment applied under slab during construction in Karachi

Baad mein nahi, pehle — why timing is everything

October se Karachi mein deemak ka season shuru hota hai. Jo plot ab foundation ya plinth stage par hai, us ka soil treatment slab dalne se pehle book karein: yeh single visit mein ho jaata hai aur slab ke baad wahi kaam drilling ke saath karna padta hai. Site ka stage aur plot size WhatsApp par bhejein, hum inspection ka din confirm kar dete hain aur quote inspection ke baad milta hai.

  • Pre-construction treatment slab ke neeche hoti hai — soil barrier decades tak protect karta hai
  • Post-construction mein drilling + injection chahiye — mehenga, disturbing, and less effective
  • Termite damage repair can cost 5–10x more than prevention — smart investment ab karo, lakhs bachao baad mein

Pre-Construction vs Post-Construction — Side by Side

Choose the right treatment for your construction stage.

Feature Pre-Construction Post-Construction
Timing During slab stage After construction complete
Method Soil barrier treatment Drilling + injection into walls
Cost From Rs 13,000 From Rs 13,000
Effectiveness Maximum — prevents entry High — eliminates active colonies
Warranty 90-day guarantee 90-day guarantee
Disruption None — done during construction Minimal drilling required

Our 4-Step Termite Treatment Process

From inspection to warranty — here's exactly what happens.

1

Site Survey

We visit, assess your construction stage and soil type. The site survey is Rs 1,000, and you get a written quote after the visit.

2

Treatment Plan

Soil barrier + wood treatment recommendation tailored to your plot.

3

Treatment

Pest control technicians apply treatment chemicals on-site.

4

Warranty Issued

90-day guarantee registered to your property address.

Existing-Home Prices for Comparison

The rates below apply to already-built homes by property size in square yards. New-construction soil treatment needs a separate project quote after inspection.

Property Size Termite Treatment Price
Up to 100 sq yds (small flat) Rs 13,000
101–200 sq yds (standard house) Rs 17,000
201–300 sq yds (large home) Rs 20,000
301–500 sq yds (large house / bungalow) Rs 27,000
501–1,000 sq yds (villa) Rs 37,000
Post-construction drilling, soil injection + wood treatment. 90-day guarantee included.

Price confirmed before we start. Zero hidden charges. Balance paid to technician on the day.

If the house is already built and you are seeing deemak, the post-construction service page has the full termite treatment cost by property size.

Not sure of your property size? WhatsApp us — we will confirm during booking.

See Existing-Home Treatment →

Our Work — Before & After

Termite soil treatment applied under slab during construction in Karachi

Before: Soil treatment during construction

Completed foundation with termite treatment certificate in Karachi

After: Protected foundation complete

Termites in an existing home?

See post-construction termite treatment and property-size prices for already-built homes. New-construction treatment is planned around the building stages.

90-day guarantee - registered against your property
Follow treatment-specific preparation and re-entry instructions
DHA Phase 1–8, Clifton, Gulshan, PECHS, Bahria Town
Site survey Rs 1,000, then a written quote

Frequently Asked Questions

Pre-construction treatment slab pouring se pehle karwani chahiye — jab soil abhi exposed ho. Ideal time: after excavation, before the concrete slab is poured. Once construction is complete, you'll need the more expensive post-construction method.
For post-construction treatment, you can go back in after 30 minutes to 1 hour, once treated surfaces are dry. Keep children and pets out of treated rooms until then. Our technician will give you specific instructions on the day.
Our 90-day guarantee covers any re-infestation of termites at the treated property. If termites return within 90 days, we return and re-treat at no additional cost. The warranty is registered against your property address.
For maximum effectiveness, yes: we recommend treating the entire foundation perimeter and soil beneath the slab. Partial treatment leaves entry points. We'll advise exactly what's needed during the site survey.
Yes — post-construction treatment involves drilling small holes (approx 12mm diameter) along the floor-wall junction to inject termiticide. Holes are filled and sealed after treatment. Minimal visual impact.
Pre-construction treatment for a 200 sq yd plot takes approximately 3–4 hours. Post-construction treatment for the same size takes 4–6 hours including drilling, injection, and sealing.

Site survey book karo

Hum aate hain, dekhte hain. Site survey Rs 1,000 ka hai, visit ke baad likha hua quote milta hai.

Book a Site Survey →